2005-2008 to Valtorta (Bergamo)
Planing and Directional work
Conservative renewal with change of intended use of the building by former rural intervention demolition and subsequent reconstruction and expansion of the outer shell in local stone at sight; as well as interior work for internal distribution suitable for the formation of a housing unit located on two floors, with the insole and wooden roof.